Hoppa till innehåll

New projects

We invest forward! In 2030, we will own and manage 3,500 apartments, primarily through new production of self-owned properties. Below we have listed our upcoming projects.

Gibraltargatan West (Mossen)

Together with the City of Gothenburg, Gothenburg Studenters Företagsgrupp AB, Trollängen Bostad AB, JM and Okidoki, we plan to develop the fringe zone on the west side of Gibraltargatan into a better, more interesting and more exciting place for everyone. This by developing beautiful, climate-smart and green buildings. Q1 2021 started detailed planning work with SBK plan.

Link to map


Gibraltarvallen: 250 apartments, Campus Johanneberg

Akademiska Hus is developing a large detailed plan area on Campus Johanneberg in Gothenburg. The area includes a student housing block – MIRA. Akademiska Hus cooperates with Chalmers studentbostäder regarding the Student Housing. The building committee approved the entire detailed plan in its meeting in November 2021 and the municipal council has adopted the detailed plan. Akademiska Hus has started its planning and our assessment is that a first stage involving extensive infrastructure and the procurement of contractors can start Q2/Q3 2024. Akademiska Hus and Chalmers Studentbostäder are now working on drawing up an LOI, with the aim that Chalmers Studentbostäder will sublease the property MIRA from Akademiska Hus. The entire MIRA student housing project is tentatively estimated to be ready for occupancy by the turn of the year 2027/2028 at the latest. The project will result in a varied range of apartment types for students.

Link to map Chalmers Tvärgata

Link to map Gibraltarvallen


 

Holtermanska new development: 450 new apartments

We plan to build between 300-350 apartments in a climate-smart and green project with a nice design at the main entrance to Chalmers. The planning office’s planning documents with planning regulations are ready. The municipal council adopted the detailed plan on March 28. 2023. Work on revising our feasibility study is planned for Q1. 2023. Preliminary statutory detailed plan, if not appealed expected in Q2.2023. If the detailed plan is appealed for about 1 year, the detailed plan is expected to gain legal force in Q2.2024. The entire project is planned to be ready during Q1.2027 in the best case, and we are aiming for phased occupancy of the various buildings.

Link to map

 

The tower on Emilsborg

We plan to exploit the student housing area at Emilsborg with new student apartments inside the farm, without removing the existing qualities of the farm. The Building Committee (BN) decided in a meeting in December 2021 to adopt a proposal for a starting plan for 2022, which includes our project the tower at Emilsborg. The City of Gothenburg, in collaboration with Chalmers Student Housing, has decided to move the start of the plan to the year 2024. Preliminary completion of the project is estimated at the turn of the year 2027/2028.